Global Projects
Deploying our proprietary technology to unlock value from industrial waste worldwide.
Witbank Facility
First Industrial Production Plant
Our flagship facility is a world-first, processing titanomagnetite tailings with under 32% titanium content—materials standard processes cannot touch (typically requiring 50-70%). This facility turns environmental liabilities into high-purity assets.
Output Capacity
22,000tons
Products
- • Titanium Dioxide
- • Vanadium Pentoxide
- • Alumina Oxide
- • Magnesium Sulphate
Commercial Advantages
- Huge quantities of available feedstock (tailings) without high-risk mining operations.
- Located in an industrial park with existing transport and energy infrastructure.
- Environmentally responsible: Zero harm policies and sustainable development.
Strategic Impact
Economic Viability
Attractive EBITDA Margins & Low Operating Costs. High value product output ensures rapid ROI.
- Attractive EBITDA Margins
- Low Operating Costs
- High Value Output
Cost Efficiency
Shared production costs across multiple minerals (Ti, V, Al) create a highly attractive revenue-to-cost ratio.
- Multi-mineral Revenue
- Diversified Income
- Shared Opex
Climate Solutions
Zero Waste & Reduced Carbon Footprint. Directly addressing long-term climate change impact with sustainable tech.
- Lower Carbon Footprint
- Zero Waste Output
- Sustainable Future
Low Technical Risk
Innovation lies in the process, not unproven hardware. Uses standard, cost-effective industrial equipment.
- Proven Equipment
- Standard Hardware
- Process Innovation
