Global Projects

Deploying our proprietary technology to unlock value from industrial waste worldwide.

Operational Pipeline Witbank, South Africa

Witbank Facility

First Industrial Production Plant

Our flagship facility is a world-first, processing titanomagnetite tailings with under 32% titanium content—materials standard processes cannot touch (typically requiring 50-70%). This facility turns environmental liabilities into high-purity assets.

Output Capacity

22,000tons

Products

  • • Titanium Dioxide
  • • Vanadium Pentoxide
  • • Alumina Oxide
  • • Magnesium Sulphate

Commercial Advantages

  • Huge quantities of available feedstock (tailings) without high-risk mining operations.
  • Located in an industrial park with existing transport and energy infrastructure.
  • Environmentally responsible: Zero harm policies and sustainable development.

Strategic Impact

01

Economic Viability

Attractive EBITDA Margins & Low Operating Costs. High value product output ensures rapid ROI.

  • Attractive EBITDA Margins
  • Low Operating Costs
  • High Value Output
Learn More
02

Cost Efficiency

Shared production costs across multiple minerals (Ti, V, Al) create a highly attractive revenue-to-cost ratio.

  • Multi-mineral Revenue
  • Diversified Income
  • Shared Opex
Learn More
03

Climate Solutions

Zero Waste & Reduced Carbon Footprint. Directly addressing long-term climate change impact with sustainable tech.

  • Lower Carbon Footprint
  • Zero Waste Output
  • Sustainable Future
Learn More
04

Low Technical Risk

Innovation lies in the process, not unproven hardware. Uses standard, cost-effective industrial equipment.

  • Proven Equipment
  • Standard Hardware
  • Process Innovation
Learn More